Skip to main content

MA000020Construction

Building Award

Building and Construction General On-site Award 2020

Who does this award cover?

The Building Award covers employees working in construction, including the following common roles:

LabourerCarpenterElectricianPlumberSite supervisorBricklayerPainter

Pay rates by classification

ClassificationBase (per hour)Casual (+25%)Weekly (38h)
Level 1 (CW/ECW 1) — level a (new entrant)$26.67$33.34$1013.46
Level 1 (CW/ECW 1) — level b (after 3 months in the industry)$27.20$34.00$1033.60
Level 1 (CW/ECW 1) — level c (after 12 months in the industry)$27.56$34.45$1047.28
Level 1 (CW/ECW 1) — level d (competent construction worker 1)$28.05$35.06$1065.90
Level 2 (CW/ECW 2)$28.62$35.78$1087.56
Level 3 (CW/ECW 3) — trade level$29.45$36.81$1119.10
Level 4 (CW/ECW 4)$30.38$37.98$1154.44
Level 5 (CW/ECW 5)$31.31$39.14$1189.78
Level 6 (CW/ECW 6)$32.14$40.18$1221.32
Level 7 (CW/ECW 7)$33.06$41.33$1256.28
Level 8 (CW/ECW 8)$33.86$42.33$1286.68
Level 9 (ECW 9)$34.46$43.08$1309.48

Rates shown are hourly permanent (base) and casual (base + 25% loading). Always verify with the official FWC document — rates change annually on 1 July following the Fair Work Commission's Annual Wage Review.

Penalty rates

Saturday (first 2 hours)1.50×
Saturday (after 2 hours, or any work after 12 noon)2.00×
Sunday2.00×
Public Holiday2.50×
Overtime Mon–Fri (first 2 hours)1.50×
Overtime Mon–Fri (after 2 hours)2.00×
Afternoon, night or early morning shift (5 consecutive shifts Mon–Fri)1.50×
Morning or early afternoon shift (5 consecutive shifts Mon–Fri)1.25×

How casual overtime is calculated

One of the most common payroll questions under the Building Award: when a casual works overtime or weekend hours, does the 1.5× or 2× multiplier apply to the base rate, or to the 25%-loaded casual rate? The answer depends on how the award is drafted.

Method for the Building Award

Additive — penalty % + 25% loading applied to the base rate

Source: Clause 12.5 · Verified against the award text

Where the relevant penalty rate is 150%, the employee must be paid 175% of the ordinary hourly rate; where 200%, 225%. The 25% casual loading is added to the penalty percentage, not compounded.

MethodCalculationHourly rate
Additive (used by this award)$29.45 × 175%$51.54
Compounded $36.81 × 150%$55.22
Separate $29.45 × 150%$44.18

Worked example: casual CW/ECW 3 (base $29.45/hr), first block of overtime at 150%. Different awards produce different hourly rates from the same base because the 25% loading is applied differently.

Calculate casual overtime for any scenario →

Break entitlements

Shift lengthMeal breakRest breakPaid?
Up to 5 hours——No
5–8 hours30 min—No
8–10 hours30 min10 minYes
10+ hours60 min20 minYes

Want the full MA000020 document?

This page covers the headline rates, penalties, and break rules. The full award has dozens more clauses: allowances, overtime formulas, rostering rules, dispute procedures, and classification descriptors. WageHub answers plain-English questions grounded on every clause, with a citation back to the award on every answer.

Get notified when award rates change

Free alerts when the Building Award pay rates are updated (annually on 1 July) or when the Fair Work Commission varies the award.

Free forever. No spam. Unsubscribe anytime.